The Maderra team has a vast amount of experience working on projects involving new builds, renovations, telecommunications, infrastructure, etc. We have a solid portfolio of clients who we were able to provide efficient and practical solutions to suit their project needs.:

Commercial Facilities

Arts and Culture Centre Concourse Lighting System

Project: DTW011 Arts and Culture Centre Concourse Lighting System

Year: 2014

Client: Department of Transportation and Works

Description:

​Maderra provided engineering services for the main lobby lighting upgrade at the Arts and Culture Center in St. John’s, NL. Maderra completed concept design, which included a preliminary site investigation and provided construction estimates for various options, including:
• Upgrading lighting for the lower and upper concourse with LED fixtures
• Wall wash on the upper concourse with all white LED wall wash
• Wall wash on the upper concourse with color changing LED wall wash over brick mural
• New LED lighting outside for main entrance, including wall packs and upgrading recessed down lights with LED bulbs or fixtures
• Replacing emergency lighting with fixtures that are better suited for the area

Maderra also provided Design Development, Contract Documents, Tendering and Construction Contract Award, and Construction Contract Administration.

Consulting Engineering | Arts and Culture Centre Concourse Lighting System

The Cabox Building, 45 Hebron Way, St. John's

Project: CPL001 The Cabox Building, 45 Hebron Way, St. John's

Year: 2015

Client: Cabox Properties Limited

Description:

The Cabox Building is a modern Class A 35,000 square ft. three storey office building, which opened in 2015. The building features above-average design sophistication with a complex shape and substantial curtain walls and interior glazing, providing viewing interest throughout. The building includes a partial basement to house the water entrance, main electrical room, elevator mechanical room, janitors room, and offers additional building storage space in order to maximize the rentable space on the main floors.

Maderra was prime consultant to the Owner and acted throughout as Owner Representative. Maderra's scope invovled the following:
•Project Management (cost control support and reporting delivered by Maderra financial personnel)
•Mechanical and Electrical Engineering was supplemented by subconsultants hired for Base Building included Architecture, Civil Engineering and Geotechnical Engineering;
•A general contractor was hired that included the structural design for foundations and steel on a design-build basis
•Maderra coordinated all disciplines and builder meetings through design and supported the builder during construction and commissioning
•Issued for Review, Issued for Permit, Issued for Pricing, and Issued for Construction packages were provided to the client and contractors
•A detailed Work Breakdown Structure Methodology was employed to budget and manage all phases of development and execution
•Tenant fit-ups completed as separate contract packages using the same approach as above
•For the anchor tenant, Maderra added an Interior Design subconsultant and executed RFPs for multiple furniture package, AV equipment installation, and powered and manual solar shades
•For other tenants, turnkey packages included provision of all design and constructions services under a single contract managed for the Tenant by Maderra

Consulting Engineering | The Cabox Building

ELECTRICAL SYSTEMS DESIGN OF A 6.0M MOBILE SITE OFFICE TRAILER

Project: NLM001 ELECTRICAL SYSTEMS DESIGN OF A 6.0M MOBILE SITE OFFICE TRAILER

Year: 2014

Client: NLMS Limited

Description:

​Maderra was awarded a contract for the engineering of electrical systems, including data distribution, for a 6.0m mobile site office trailer design.

Maderra produced design drawings with required specification on drawings for the electrical works in two stages: issued for review documents and issued for construction documents. The design comprised of:
•120/240 single phase electrical service
•Meter box without meter or mast
•Electric baseboard heat
•Ceiling fluorescent lighting
•Emergency lighting battery pack
•Prewired data distribution (wiring only)
•Thru-wall HVAC unit option to be determined by NLMS – electrical design to provide 120VAC outlet only

Maderra subsequently completed Phase 2 of the project, which included both structural and electrical engineering services. Maderra utilized an existing product platform to subsequently create the required engineered drawings for several product platforms distinguished by their length (6m, 9m, and 12m). Electrical Engineering and design was also completed for the additional 9m and 12m trailers.

Consulting Engineering | ELECTRICAL SYSTEMS DESIGN OF A 6.0M MOBILE SITE OFFICE TRAILER

Harris Ryan Office Renovation/Expansion

Project: CHD002 Harris Ryan Office Renovation/Expansion

Year: 2015

Client: Carvel and Helm Interior Designs

Description:

​Maderra was contracted to provide mechanical and electrical services for the renovation and expansion of the Harris Ryan Accountants office, located in Suite 202 of 120 Stavanger Drive. Specifically, the work included a near-complete refit of the 2000 sq.ft. expansion space and partial refit of the existing 4000sqft office space. The essential use and functionality of the space was to remain the same.

Consulting Engineering | Harris Ryan Office Renovation/Expansion

ELECTRICAL SYSTEMS DESIGN OF A 6.0M MOBILE SITE OFFICE TRAILER

Project: NLM001 ELECTRICAL SYSTEMS DESIGN OF A 6.0M MOBILE SITE OFFICE TRAILER

Year: 2014

Client: NLMS Limited

Description:

​Maderra provided engineering of electrical systems, including data distribution for a 6.0m mobile site office trailer design.

Consulting Engineering | ELECTRICAL SYSTEMS DESIGN OF A 6.0M MOBILE SITE OFFICE TRAILER

Inspection of All Light Poles at The Village Mall

Project: PRR003 Inspection of All Light Poles at The Village Mall

Year: 2015

Client: Plaza Retail

Description:

Maderra provided an inspection of all light poles currently in place at the Village Mall Shopping Centre in St. John's, NL. The specific scope of work involved a site assessment (approximately 20 parking lot light poles on site), NDT report review , site report/drawing, connection check, steel member check, concrete foundation check and providing an approval letter

Consulting Engineering | Inspection of All Light Poles at The Village Mall

ELECTRICAL ENGINEERING SERVICES FOR CORA'S AT 15 HEBRON WAY

Project: CHI006 ELECTRICAL ENGINEERING SERVICES FOR CORA'S AT 15 HEBRON WAY

Year: 2015

Client: Chimo Construction

Description:

Maderra provided engineering services for electrical system revisions at 15 Hebron Way in St. Johns, NL. Maderra coordinated with the contractor and provided revised distribution drawings.

Consulting Engineering | ELECTRICAL ENGINEERING SERVICES FOR CORA’S AT 15 HEBRON WAY

New Data Centre in Labrador City

Project: GND001 New Data Centre in Labrador City

Year: 2015

Client: Great North Data

Description:

The proponent, Great North Data, required Construction Permits to renovate the building, as needed, for the installation of a new data center. A commercial construction Permit drawing package was required to include Architectural, Structural, Mechanical, and Electrical drawings sealed by registered professionals permitted to practice in the Province of Newfoundland and Labrador.

The building required substantial electrical and ventilation engineering, as required, to support the server array power demand and waste heat. The installation of the M&E services required building modifications necessitating roles for structural engineering and architecture as well.

Consulting Engineering | New Data Centre in Labrador City

Mount Pearl Light Pole Inspections

Project: 105001 Mount Pearl Light Pole Inspections

Year: 2015

Client: 10588 NFLD Ltd

Description:

The City of Mount Pearl presented a requirement 10588 NFLD Inc. to have site parking light poles inspected by a structural engineer with a requirement to perform a maintenance and an upgrade of the poles to the latest building codes requirements

Maderra Engineering was contracted perform an initial visual condition assessment from ground level on the site pole's base plate connections and determine if structural repair was a practical option or if a replacement was required.

Consulting Engineering | Mount Pearl Light Pole Inspections

Mechanical and Electrical Engineering for a New Data Centre - Labrador

Project: NOR001 Mechanical and Electrical Engineering for a New Data Centre - Labrador

Year: 2015

Client: North 53 Degrees

Description:

​Maderra provided engineering services to repurpose a former retail building at 20 Circular Drive in Labrador City, NL. The proponent, North 53 Degrees Inc., required Construction Permits to renovate the approximately 900 sq. meter building as needed for the installation of a data center. The building required substantial electrical and ventilation engineering, as required to support the server arrays and the estimated 4MW of total power demand and waste heat. The installation of the M&E services required building modifications necessitating roles for structural engineering and architecture.

Consulting Engineering | Mechanical and Electrical Engineering for a New Data Centre – Labrador

Definitions Fit-up at 45 Hebron Way

Project: DEF001 Definitions Fit-up at 45 Hebron Way

Year: 2016

Client: Definitions

Description:

Maderra was awarded the contract by Definitions to provide mechanical and electrical engineering services to complete the construction of the 4,500 (estimated) square foot office/gym fit-up to the first floor of the Cabox Properties Building, located at 45 Hebron Way, St. John’s, NL.

Consulting Engineering | Definitions Fit-up at 45 Hebron Way

Nain Trailer Assessment 

Project: AFN007 Nain Trailer Assessment 

Year: 2015

Client: AFN Engineering

Description:

Maderra Engineering was contracted to perform a visual assessment of the a Nain mobile office trailer structural condition and provided recommendations for its transport and relocation.

Consulting Engineering | Nain Trailer Assessment 

Light Pole Inspection - Best Buy - Stavanger Drive

Project: PRR001 Light Pole Inspection - Best Buy - Stavanger Drive

Year: 2015

Client: Plaza Retail

Description:

Maderra provided structural engineering services for the light pole inspection located at Best Buy on Stavanger Drive, St. John's.

Consulting Engineering | Light Pole Inspection – Best Buy – Stavanger Drive

Cougar Hangar and PAX Building

Project: LIN005 Cougar Hangar and PAX Building

Year: 2015

Client: Lindsay Construction

Description:

Maderra Engineering provided Mechanical and Electrical engineering services for the design of Cougar Helicopter’s PAX building. The building is comprised of two levels with a total of approximately 51,000 ft2. The first floor design is similar to an airport with an arrivals and departures area for passengers traveling on Cougar’s helicopters to the oilfields located off the coast of Newfoundland. The first floor includes a seating area for departures, security screening, flight briefing, and baggage handling. The second floor of the PAX building is strictly for Cougar personnel and is made up of office space, boardrooms, training classrooms, lounge/kitchen area and an operations flight deck. In addition to the building, Maderra designed the parking lot lighting layout for the facility.

Maderra provided the following services:

• Design of heating, ventilation, and air conditioning (HVAC) systems
• Design of digital controls system
• Design of plumbing system
• Location of fire alarm devices
• Lighting and its control
• Electrical baseboard heat
• Public Address System
• Card Access System
• White Noise Masking System
• Electrical Service in conjunction with Newfoundland Power
• Diesel backup generator power system
• Tender drawings and specifications
• Contract Administration

Maderra worked closely with other consultants, vendors, contractors, and Cougar personnel to ensure project schedule and to react to the project’s dynamic scope of work.

Consulting Engineering | Cougar Hangar and PAX Building

Long Harbour Warehouse Fit-up

Project: PBH001 Long Harbour Warehouse Fit-up

Year: 2014

Client: Placentia Bay Holdings

Description:

Maderra was awarded this project for the provision of mechanical, electrical and structural engineering services for a warehouse building located in Long Harbour, NL.

Consulting Engineering | Long Harbour Warehouse Fit-up

Electrical Design For TW Depot

Project: SSL001 Electrical Design For TW Depot

Year: 2014

Client: Silk Stevens Limited

Description:

Electrical design services to support consulting commitments to a design-build project for a new TW Depot maintenance building at Victoria Cove, NL

Consulting Engineering | Electrical Design For TW Depot

Wharf Construction For Talon Fabrication Shop At Port Aux Basques, Nl

Project: AFN003 Wharf Construction For Talon Fabrication Shop At Port Aux Basques, Nl

Year: 2014

Client: AFN Engineering

Description:

Provide engineering services for wharf construction for a Talon fabrication shop in at Port Aux Basques, NL

Consulting Engineering | Wharf Construction For Talon Fabrication Shop At Port Aux Basques, Nl

HSE Assessment for the Dopeless System

Project: TEN001 HSE Assessment for the Dopeless System

Year: 2014

Client: Tenaris Prudential

Description:

To provide a HSE assessment of setting up a processing facility in Paradise, NL centered on the proprietary Tenaris dopeless technology

Consulting Engineering | HSE Assessment for the Dopeless System

HJ Connell’s Cafeteria in Labrador City

Project: RCM004 HJ Connell’s Cafeteria in Labrador City

Year: 2014

Client: RCM Modulaire

Description:

Supply mechanical and electrical engineering and design services for the HJ O'Connell’s Cafeteria in Labrador City

Consulting Engineering | HJ Connell’s Cafeteria in Labrador City

Phase 2 - Structural and Electrical Design and Inspections

Project: NLM001 Phase 2 - Structural and Electrical Design and Inspections

Year: 2014

Client: NLMS Limited

Description:

Provide engineering services to support the production of a mobile shelter product line and to issue documentation verifying that the products have been designed and constructed to meet applicable codes

Consulting Engineering | Phase 2 – Structural and Electrical Design and Inspections

Electrical Systems Design of a 6.0m Mobile Site Office Trailer

Project: NLM001 Electrical Systems Design of a 6.0m Mobile Site Office Trailer

Year: 2013

Client: NL Mobile Shelters

Description:

Produce design drawings with required specification on drawings for the electrical works for a 6.0m mobile site office trailer design

Consulting Engineering | Electrical Systems Design Of A 6.0m Mobile Site Office Trailer

Fabrication of Work Shop Benches

Project: KAR002 Fabrication of Work Shop Benches

Year: 2013

Client: Karrigan Process Solutions International

Description:

Provide Stamped Engineered drawings of Steel Shop Work Benches.

Consulting Engineering | Fabrication of Work Shop Benches

Shop Pipe Racks

Project: KAR001 Shop Pipe Racks

Year: 2013

Client: Karrigan Process Solutions International

Description:

Produce an engineered drawing for work shop stands.

Consulting Engineering | Shop Pipe Racks

Salmonier Discovery Centre Phase 2 and Phase 3

Project: FSA004 Salmonier Discovery Centre Phase 2 and Phase 3

Year: 2013

Client: Frank Stanley and Associates

Description:

The Salmonier Discovery Centre is a 925 m2 new building construction located at the Salmonier Nature Park located in Salmonier Line, NL. The building is intended to replace the existing visitors centre, and includes display areas, classroom space, meeting rooms, residential grade kitchen and a gift shop.

Project Role
Maderra Engineering completed the mechanical and electrical system design.

Challenges
One of the main challenges of this project was to achieve LEED certification. This project is located in a rural setting, and since LEED is geared toward larger city centres several LEED credits were difficult to attain. The interior fit-up of the lower level was not completed during the initial construction phase, however, allowances were included to ensure LEED compliance during future fit-up. This building was also constructed on a site adjacent to several satellite buildings; therefore existing electrical and mechanical site services were limited and upgrades were required.

Consulting Engineering | Salmonier Discovery Centre Phase 2 and Phase 3

Structural Inspection Arnolds Cove Scotia Bank

Project: BYR001 Structural Inspection Arnolds Cove Scotia Bank

Year: 2013

Client: Byrne on Demand

Description:

Damage was sustained on the building; Scotiabank requested a visual inspection to determine the extent.

Consulting Engineering | Structural Inspection Arnolds Cove Scotia Bank

Churchill Falls Hotel (Midway Inn) – Building Condition Assessment

Project: RDB-008 Churchill Falls Hotel (Midway Inn) – Building Condition Assessment

Year: 2013

Client: RDB Engineering

Description:

The project included an evaluation of potential upgrades to the Midway Inn Hotel, which is situated in the Town Center Building (TCB), Churchill Falls. The objective of the project was to prepare a report that documented current conditions and make recommendations for upgrading, including a cost estimate for future planning and budgeting by Nalcor.

Project Role:

Maderra Engineering completed the mechanical and electrical building assessment.

Challenges:

The Town Center Building (TCB), which includes the Midway Inn, was constructed in 1968 as part of the Churchill Falls Project. Due to the building age there were several assets in need of significant upgrading and/or replacement due to their current physical condition and for aesthetic, operational and functional reasons, as well as to meet present day codes.

Consulting Engineering | Churchill Falls Hotel Upgrading

Newtrans Equipment Carriers Ltd. – Ventilation Upgrades

Project: NEC-001 Newtrans Equipment Carriers Ltd. – Ventilation Upgrades

Year: 2013

Client: Newtrans Equipment Carriers Ltd.

Description:

Provide Mechanical and Electrical drawing package to outline ventilation improvements as required by Government Services Report #0860171.

Consulting Engineering | Newtrans Equipment Carriers Ltd. – Ventilation Upgrades

KFC-Avalon Mall

Project: VFP-001 KFC-Avalon Mall

Year: 2013

Client: Valmin Fire Protection Ltd.

Description:

Replacement of kitchen exhaust hoods in the KFC building on Kenmount Road

Consulting Engineering | KFC-Avalon Mall

St. John’s Harbour Pier 23 Building Renovations Phase 2

Project: IRV-001 St. John’s Harbour Pier 23 Building Renovations Phase 2

Year: 2013

Client: Irving Oil

Description:

Complete structural analysis of columns on Irving Oil’s Pier 23 building in St. John’s Harbour.

Consulting Engineering | St. John’s Harbour Pier 23 Building Renovations Phase 2

St. John's Harbour Pier 23 Building Renovations Phase 1

Project: IRV-001 St. John's Harbour Pier 23 Building Renovations Phase 1

Year: 2012

Client: Irving Oil Ltd.

Description:

St. John's Harbour Pier 23 building survey and production of floor plan As-Built drawings.

Consulting Engineering | St. John’s Harbour Pier 23 Building Renovations Phase 1

Glencoe Drive Building Upgrades

Project: TAL-003 Glencoe Drive Building Upgrades

Year: 2012

Client: Talon Energy Services

Description:

Engineering and Design of control panel for electrical heating system for Talon Energy's Glencoe Drive fabrication facility.

Consulting Engineering | Glencoe Drive Building Upgrades

Menchies Frozen Yogurt Building

Project: GIB-001 Menchies Frozen Yogurt Building

Year: 2012

Client: Gibbons Snow Architects / Menchies

Description:

Mechanical and Electrical Engineering and Design for new Menchies Frozen Yogurt Bar.

Consulting Engineering | Menchies Frozen Yogurt Building

Quality Management System Internal Audit

Project: BAS-001 Quality Management System Internal Audit

Year: 2012

Client: Talon Energy Services / Basil Fern

Description:

Completed an internal audit of Basil Fern's Quality Management System, in preparation for ISO9001 External Audit

Consulting Engineering | Quality Management System Internal Audit

Generator Storage Buildings

Project: RCI-001 Generator Storage Buildings

Year: 2011

Client: Rogers Communications

Description:

Prime Consultant and Electrical Engineering and Design of Generator Storage Buildings for Rogers Communications. Architectural, Structural, and Civil work completed as sub-contracts.

Consulting Engineering | Generator Storage Buildings

Labrador City 108 Unit Apartment Complex

Project: RCM-003 Labrador City 108 Unit Apartment Complex

Year: 2011

Client: RCM Modulaire

Description:

Mechanical and Electrical Engineering and Design for Labrador City Unit 108 Apartment Complex.

Consulting Engineering | Labrador City 108 Unit Apartment Complex

Labrador City 64 Unit Apartment Complex

Project: RCM-002 Labrador City 64 Unit Apartment Complex

Year: 2011

Client: RCM Modulaire

Description:

Mechanical and Electrical Engineering and Design for Labrador City Unit 64 Apartment Complex.

Consulting Engineering | Labrador City 64 Unit Apartment Complex

IOC Living Quarters Complex

Project: RCM-001 IOC Living Quarters Complex

Year: 2011

Client: RCM Modulaire

Description:

Mechanical and Electrical Engineering and Design for Iron Ore Company of Canada Living Quarters Complex.

Consulting Engineering | IOC Living Quarters Complex

Irving Station Mechanical System Review

Project: GEN-001 Irving Station Mechanical System Review

Year: 2011

Client: Genivar

Description:

Domestic Water and Sewer System Review for Whitbourne Irving Station.

Consulting Engineering | Irving Station Mechanical System Review

Educational

Plumbing Retrofit - Jamieson Academy, Salt Pond, NL Phase 2

Project: DOE-008 Plumbing Retrofit - Jamieson Academy, Salt Pond, NL Phase 2

Year: 2013

Client: Department of Education

Description:

Complete a design for the replacement of the water lines in the Jamison Academy school facility.

Consulting Engineering | Plumbing Retrofit – Jamieson Academy, Salt Pond, NL Phase 2

Electrical & Mechanical Design for Stella Maris School Upgrade

Project: DOE- 007 Electrical & Mechanical Design for Stella Maris School Upgrade

Year: 2013

Client: Department of Education

Description:

Mechanical and Electrical Engineering and Design for miscellaneous upgrades to the Stella Maris School

Consulting Engineering | Electrical & Mechanical Design for Stella Maris School Upgrade

Lewisporte School Kitchen Renovation

Project: EXP-002 Lewisporte School Kitchen Renovation

Year: 2013

Client: Exploits Engineering

Description:

Electrical design for renovations to the Lewisporte school kitchen facilities

Consulting Engineering | Lewisporte School Kitchen Renovation

Plumbing Retrofit – Jamieson Academy, Salt Pond, NL Phase 1

Project: DOE-008 Plumbing Retrofit – Jamieson Academy, Salt Pond, NL Phase 1

Year: 2013

Client: Department of Education

Description:

Complete an assessment of the piping, plumbing fixtures and rain water collection system. Prepare as built drawings and all contract documents.

Consulting Engineering | Plumbing Retrofit – Jamieson Academy, Salt Pond, NL Phase 1

Davis School Carbonear Mechanical Inspections

Project: GIB-003 Davis School Carbonear Mechanical Inspections

Year: 2012

Client: Gibbons Snow Architects Inc.

Description:

Provide weekly site inspections, during construction, of Mechanical systems to Davis school in Carbonear.

Consulting Engineering | Davis School Carbonear Mechanical Inspections

Bonavista Vocational School Arc Flash Study

Project: FIN- 001 Bonavista Vocational School Arc Flash Study

Year: 2012

Client: Finch Engineering Inc.

Description:

Electrical Arc Flash Study of Bonavista Vocational School electrical systems

Consulting Engineering | Bonavista Vocational School Arc Flash Study

College of North Atlantic Ecology Unit Renovations

Project: DTW-001 College of North Atlantic Ecology Unit Renovations

Year: 2012

Client: Government of NL Department of Transportation and Works

Description:

Engineering and Design of Mechanical and Electrical renovations to the Ecology Unit of the College of the North Atlantic Stephenville Campus.

Consulting Engineering | College of North Atlantic Ecology Unit Renovations

Stella Maris School Technical Assessment

Project: DOE-006 Stella Maris School Technical Assessment

Year: 2012

Client: Government of NL Department of Education

Description:

Assessment of Stella Maris School electrical systems. Engineering and Design of Electrical life safety, service entrance and distribution systems.

Consulting Engineering | Stella Maris School Technical Assessment

College of North Atlantic Electrical System Assessment and Upgrades

Project: DTW-004 College of North Atlantic Electrical System Assessment and Upgrades

Year: 2011

Client: Government of NL Department of Transportation and Works

Description:

Assessment of College of the North Atlantic Stephenville Crossing Campus electrical systems. Engineering and Design of Electrical life safety, service entrance and distribution systems.

Consulting Engineering | College of North Atlantic Electrical System Assessment and Upgrades

Assessment of Gander Academy Electrical and HVAC Systems

Project: DOE-005 Assessment of Gander Academy Electrical and HVAC Systems

Year: 2011

Client: Government of NL Department of Education

Description:

Assessment of Gander Academyall building Electrical and Heating and Ventilation systems.

Consulting Engineering | Assessment of Gander Academy Electrical and HVAC Systems

Woodland Elementary School Technical Assessment and Renovations

Project: DOE-004 Woodland Elementary School Technical Assessment and Renovations

Year: 2011

Client: Government of NL Department of Education

Description:

Assessment of Woodland Elementary School electrical systems. Engineering and Design of Electrical life safety, service entrance and distribution systems.

Consulting Engineering | Woodland Elementary School Technical Assessment and Renovations

St. John's Bosco School Technical Assessment and Renovations

Project: DOE-002 St. John's Bosco School Technical Assessment and Renovations

Year: 2011

Client: Government of NL Department of Education

Description:

Assessment of St John's Bosco school Electrical systems. Engineering and Design of facility Electrical system upgrades.

Consulting Engineering | St. John’s Bosco School Technical Assessment and Renovations

Vera Perlin School Renovations

Project: FDG-001 Vera Perlin School Renovations

Year: 2011

Client: Facilities Design Group / Vera Perlin Society

Description:

Engineering, Design, and Construction Management of Mechanical and Electrical renovations to the Vera Perlin School.

Consulting Engineering | Vera Perlin School Renovations

Government Facilities

Lighting in the Open Water Test Facility Area at the National Research Council – St. John’s

Project: NRC007 Lighting in the Open Water Test Facility Area at the National Research Council – St. John’s

Year: 2015

Client: National Research Council

Description:

Maderra was contracted to supply engineering services for the design, preparation of specification and drawings, tendering documents, construction administration and inspections for an upgrade to LED high bay lighting to replace or retrofit existing lighting in the open water test facility area at the National Research Council – St. John’s.

Consulting Engineering | Lighting in the Open Water Test Facility Area at the National Research Council – St. John’s

Arts and Culture Centre Concourse Lighting System

Project: DTW011 Arts and Culture Centre Concourse Lighting System

Year: 2014

Client: Department of Transportation and Works

Description:

​Maderra provided engineering services for the main lobby lighting upgrade at the Arts and Culture Center in St. John’s, NL. Maderra completed concept design, which included a preliminary site investigation and provided construction estimates for various options, including:
• Upgrading lighting for the lower and upper concourse with LED fixtures
• Wall wash on the upper concourse with all white LED wall wash
• Wall wash on the upper concourse with color changing LED wall wash over brick mural
• New LED lighting outside for main entrance, including wall packs and upgrading recessed down lights with LED bulbs or fixtures
• Replacing emergency lighting with fixtures that are better suited for the area

Maderra also provided Design Development, Contract Documents, Tendering and Construction Contract Award, and Construction Contract Administration.

Consulting Engineering | Arts and Culture Centre Concourse Lighting System

New Reserve Fuel Tank System

Project: NRC006 New Reserve Fuel Tank System

Year: 2014

Client: National Research Council

Description:

Maderra was awarded the contract to supply of Engineering services for the design, preparation of specification and drawings, tendering documents, construction administration and inspections for a new reserve fuel tank system for the emergency electrical generating system at the National Research Council – St. John’s.

Consulting Engineering | New Reserve Fuel Tank System

LED High Bay Lighting Project

Project: NRC007 LED High Bay Lighting Project

Year: 2014

Client: National Research Council - St. John's

Description:

Maderra is supplying engineering services for the design, preparation of specification and drawings, tendering documents, construction administration and inspections for an upgrade to LED high bay lighting to replace or retrofit existing lighting in the open water test facility area at the National Research Council – St. John’s.

Consulting Engineering | LED High Bay Lighting Project

Ventilation System for Mech. Room 2-2-01

Project: NRC-003 Ventilation System for Mech. Room 2-2-01

Year: 2013

Client: NRC

Description:

Mechanical and Electrical work for a new ventilation system for NRC’s facility Room 2-2-01.

Consulting Engineering | Ventilation System for Mech. Room 2-2-01

Deer Lake Depot Soils Laboratory Ventilation System Upgrades

Project: DTW-012 Deer Lake Depot Soils Laboratory Ventilation System Upgrades

Year: 2012

Client: Government of NL Department of Transportation and Works

Description:

Mechanical and Electrical Engineering and Design of Deer Lake Depot Soils Laboratory Ventilation system upgrades.

Consulting Engineering | Deer Lake Depot Soils Laboratory Ventilation System Upgrades

Taxation Centre energy Model Analysis

Project: SNC-003 Taxation Centre energy Model Analysis

Year: 2012

Client: SNC O&M / Government of Canada

Description:

Completed preliminary Energy Model Analysis for St. John's Taxation Centre.

Consulting Engineering | Taxation Centre energy Model Analysis

Sir Humphrey Gilbert Building Lighting Controls

Project: SNC-002 Sir Humphrey Gilbert Building Lighting Controls

Year: 2012

Client: SNC O&M / Government of Canada

Description:

Electrical Engineering and Design for Sir Humphrey Gilbert Building Lighting Controls Upgrade.

Consulting Engineering | Sir Humphrey Gilbert Building Lighting Controls

Arts and Culture Centre Lighting Upgrade

Project: DTW-011 Arts and Culture Centre Lighting Upgrade

Year: 2011

Client: Government of NL Department of Transportation and Works

Description:

Engineering and Design of St. John's Arts and Culture Centre Lighting system upgrades.

Consulting Engineering | Arts and Culture Centre Lighting Upgrade

St. John's Courthouse Electrical Upgrades

Project: DTW-010 St. John's Courthouse Electrical Upgrades

Year: 2011

Client: Government of NL Department of Transportation and Works

Description:

Electrical Engineering and Design for Emergency Lighting, Service Entrance, electrical Feeder and Distribution for the St. John's Courthouse.

Consulting Engineering | St. John’s Courthouse Electrical Upgrades

NRC Research Facility Ventilation System

Project: NRC-002 NRC Research Facility Ventilation System

Year: 2011

Client: National Research Council

Description:

Engineering and Design of a replacement welding fume exhaust system for NRC Research Facility Welding Shop Ventilation System.

Consulting Engineering | NRC Research Facility Ventilation System

Hangar No. 1 - 9 Wing Gander

Project: MHF-001 Hangar No. 1 - 9 Wing Gander

Year: 2011

Client: Morrison Hershfield / Government of Canada

Description:

Mechanical and Electrical Engineering and Design of renovations to hanger at 9 Wing Gander.

Consulting Engineering | Hangar No. 1 – 9 Wing Gander

Discovery Pavilion Salmonier Line

Project: FSA-004 Discovery Pavilion Salmonier Line

Year: 2011

Client: Franks Stanley and Associates / Government of NL

Description:

Following LEED principles, Engineering and Design of all mechanical and electrical systems for the Salmonier Nature Park Discovery Centre.

Consulting Engineering | Discovery Pavilion Salmonier Line

Marine Infrastructure

Contract Administration Services for the Happy Adventure Wharf Upgrade

Project: DFO025 Contract Administration Services for the Happy Adventure Wharf Upgrade

Year: 2016

Client: DFO - Department of Fisheries and Oceans

Description:

Maderra provided engineering services for the Happy Adventure Wharf Upgrade, which included a review of shop drawings, answering inquiries from the contractor and providing necessary change orders or clarifications, as required. Once the construction was completed the scope involved a one day commissioning site visit and shop drawing review.

Consulting Engineering | Contract Administration Services for the Happy Adventure Wharf Upgrade

Fermeuse Wharf Construction

Project: MER029 Fermeuse Wharf Construction

Year: 2016

Client: Meridian Engineering

Description:

Maderra provided engineering services for electrical upgrades to the Fermeuse Wharf. Maderra completed an initial site visit to investigate existing site conditions and pedestals. Additionally, Maderra provided design development, contract documents, tendering and construction contract award.

Consulting Engineering | Fermeuse Wharf Construction

Marginal Wharf Construction - Charlottetown, Newfoundland and Labrador

Project: MER028 Marginal Wharf Construction - Charlottetown, Newfoundland and Labrador

Year: 2016

Client: Meridian Engineering

Description:

Maderra provided engineering services for electrical upgrades to the Charlottetown Marginal Wharf. Maderra completed an initial site visit to investigate existing site conditions and pedestals. Additionally, Maderra provided design development, contract documents, and tendering and construction contract award.

Consulting Engineering | Marginal Wharf Construction – Charlottetown, Newfoundland and Labrador

Lumsden Wharf Electrical Upgrade

Project: DFO022 Lumsden Wharf Electrical Upgrade

Year: 2015

Client: Department of Fisheries and Oceans

Description:

Maderra was awarded the contract to provide engineering services for the electrical wharf upgrades at Lumsden Wharf.

This project was a two part design as follows:
Phase 1: This phase included an initial site visit to determine existing conditions on site, a design for conduit placements in decking for future installation of electrical equipment, design for installation of the light pole, and a specification.
Phase 2: This phase included the design of installation of electrical pedestals, electrical equipment and owner supplied lights, as well as specification.

Consulting Engineering | Lumsden Wharf Electrical Upgrade

Preliminary Assessment of the Argentia Approach Ramp

Project: MAI004 Preliminary Assessment of the Argentia Approach Ramp

Year: 2015

Client: Marine Atlantic

Description:

​Maderra provided a condition assessment of the transfer bridge beams on the Argentia approach ramp and made recommendations for further actions required (i.e. further testing, repairs etc.). Maderra performed a visual examination on site and delivered a recommendations report for subsequent action / investigation. The report advised on potential design issues, inspection requirements and repair options, (where determined).

Consulting Engineering | Preliminary Assessment of the Argentia Approach Ramp

Prosser's Rock Wharf Electrical Upgrade

Project: DFO023 Prosser's Rock Wharf Electrical Upgrade

Year: 2015

Client: Department of Fisheries and Oceans

Description:

​Maderra was awarded a contract to provide engineering services for Prosser's Rock Wharf Electrical Upgrades.

Maderra conducted a site investigation, which included a discussion with the Harbour Authority regarding the requirements needed for the new wharf. Maderra also had to determine the existing service size and connected loads as well as the upgrades that were required for metering equipment for pedestals. Maderra also provided design development, contract documents and tendering and construction contract award.

Consulting Engineering | Prosser’s Rock Wharf Electrical Upgrade

Engineering Consulting Services for Davie Shipbuilding

Project: CHA001 Engineering Consulting Services for Davie Shipbuilding

Year: 2015

Client: Eutex International Group / Chantier Davie Canada Inc.

Description:

Davie shipbuilding was awarded a contract to build North America’s first dual-fuel LNG ferries; for the province of Quebec. The two dual-fuel LNG Ro-Pax ferries will operate on the St. Lawrence River on the Tadoussac-Baie-Sainte-Catherine route, due to enter service in 2015

Subsequently, Maderra was contracted provide engineering services to Davie, with a scope of work that included more than 1000 deliverables for complete ship electrical discipline layout drawings, cable routing, cable lists, transit details, and termination details.

Maderra worked closely with Davie and their vendors to coordinate cable specifications throughout engineering and construction.

Consulting Engineering | Engineering Consulting Services for Davie Shipbuilding

Catalina Wharf Construction.

Project: HMM001 Catalina Wharf Construction.

Year: 2015

Client: Hatch Mott MacDonald Inc

Description:

Maderra was contracted to provide electrical upgrades for the Catalina Wharf Construction. v Specifically, Maderra provided a site investigation, which included a discussion with the Harbour Authority regarding the requirements for the new wharf, determination of the existing service size and connected loads and if there was a requirements for metering of pedestals. Maderra also provided Design Development, Contract Documents and Tendering and Construction Contract Award.

Consulting Engineering | Catalina Wharf Construction

CONTRACT ADMINISTRATION FOR PORT DE GRAVE MARGINAL WHARF

Project: AFN009 CONTRACT ADMINISTRATION FOR PORT DE GRAVE MARGINAL WHARF

Year: 2016

Client: AFN Engineering

Description:

Maderra was awarded the contract by AFN Engineering to provide design changes as well as Contract Administration for Port De Grave Marginal Wharf. Specifically, the scope involved a visit to the existing site to gather additional information required to produce drawings, including a drawing specification for the General Contractor to price for including the existing winch motor into the project. Maderra provided Contract Administration through the review shop drawings, answered questions for the contractor and provided additional change orders / clarifications, as required. A commissioning site visit will also be required once construction is completed.

» Case Study

Consulting Engineering | CONTRACT ADMINISTRATION FOR PORT DE GRAVE MARGINAL WHARF

ST. LUNAIRE WHARF CONTRACT ADMINISTRATION

Project: MER027 ST. LUNAIRE WHARF CONTRACT ADMINISTRATION

Year: 2015

Client: Meridian Engineering

Description:

Maderra provided engineering services for St. Lunaire Wharf Contract Administration, which included a review of shop drawings, answering questions for the contractor and providing necessary change orders or clarifications, as required. Part of the scope was to also to a commissioning site visit once construction complete.

Consulting Engineering | ST. LUNAIRE WHARF CONTRACT ADMINISTRATION

Contract Administration for Summerville Wharf

Project: AFN008 Contract Administration for Summerville Wharf

Year: 2015

Client: AFN Engineering

Description:

​Maderra was contracted by AFN to provide contract administration for Summerville Wharf. Maderra reviewed shop drawings, answered questions for the contractor and provided necessary change orders or clarifications, as required. The scope involved a commissioning site visit once construction was complete and shop drawing review.

Consulting Engineering | Contract Administration for Summerville Wharf

Happy Adventure Marginal Wharf

Project: MER026 Happy Adventure Marginal Wharf

Year: 2015

Client: Meridian Engineering

Description:

Maderra provided electrical upgrades at the Happy Adventure Marginal Wharf. Generally, the scope involved relocation of two electrical service bollards and the installation of conduits for embedment in concrete.

Maderra conducted a site investigation, which included a discussion with the Harbour Authority regarding the requirements for the new wharf and involved determining the existing service size and connected loads and determining whether there were any outstanding issues that required upgrading in the process.

Maderra also provided Design Development, Contract Documents and Tendering and Construction Contract Award

Consulting Engineering | Happy Adventure Marginal Wharf

Electrical Upgrades for St. Bride’s Wharf Construction

Project: HMM002 Electrical Upgrades for St. Bride’s Wharf Construction

Year: 2015

Client: Hatch Mott MacDonald

Description:

Maderra provided engineering services for electrical upgrades for St. Bride's Wharf Construction. Maderra conducted a site investigation, which included assessing existing site conditions and existing pedestals, we well as advising if existing pedestals and receptacles were able to be reused. Maderra also provided design development, contract documents and tendering and construction contract award.

Consulting Engineering | Electrical Upgrades for St. Bride’s Wharf Construction

ELECTRICAL UPGRADES FOR BURIN MARGINAL WHARF

Project: DFO024 ELECTRICAL UPGRADES FOR BURIN MARGINAL WHARF

Year: 2016

Client: Department of Fisheries and Oceans

Description:

Maderra was contracted by DFO to provide engineering services for electrical upgrades to Burin Marginal Wharf. Maderra completed an initial site visit, which included and assessment of existing site conditions and existing pedestals as well as providing recommendations on whether the pedestals and receptacles could be reused. Maderra completed the Design Development, Contract Documents and Tendering and Construction Contract Award.

Consulting Engineering | ELECTRICAL UPGRADES FOR BURIN MARGINAL WHARF

Marine Terminal Standby Generator Supply

Project: IOR002 Marine Terminal Standby Generator Supply

Year: 2015

Client: Irving Oil Refining

Description:

Maderra conducted a site visit to gather information pertaining the standby power requirements for the Marine Terminal and the Tank Farm. The information gathered was used to produce detailed electrical and structural drawings for the installation of two new standby generators, one 10kW and the other 100kW.

Consulting Engineering | Marine Terminal Standby Generator Supply

Assessment of the Argentia Approach Ramp

Project: MAI004 Assessment of the Argentia Approach Ramp

Year: 2015

Client: Marine Atlantic

Description:

Maderra provided a condition assessment of the transfer bridge beams on the Argentia approach ramp and to made recommendations for further actions required.

Consulting Engineering | Assessment of the Argentia Approach Ramp

Wharf Inspections for Fender Replacement

Project: MAI003 Wharf Inspections for Fender Replacement

Year: 2015

Client: Marine Atlantic

Description:

Maderra provided a thorough site assessment of its four main docks located at North Sydney (NSY) and Port aux Basques (PAB). Prior to committing capital to the fender upgrading requirements, as found in Maderra’s Fender Panel Evaluation study, which was completed in March 2015.

Consulting Engineering | Wharf Inspections for Fender Replacement  

NEW MARGINAL WHARF - PORT DE GRAVE, NL

Project: MER021 NEW MARGINAL WHARF - PORT DE GRAVE, NL

Year: 2015

Client: MERIDIAN ENGINEERING

Description:

Maderra performed a preliminary site investigation and reviewed existing information to complete the electrical design for a new marginal wharf structure in Port de Grave, NL.. The new design included: the removal of existing electrical including light poles, electrical service, conduits and cables on the wharf; a new electrical layout including new pedestals, metering of pedestals, light poles and lights, and new electrical service for an enclosure located at the end of the wharf; and electrical specifications for book specification

Consulting Engineering | NEW MARGINAL WHARF – PORT DE GRAVE, NL

PORT AU CHOIX WHARF - NL

Project: MER020 PORT AU CHOIX WHARF - NL

Year: 2015

Client: Meridian Engineering

Description:

Maderra has been awarded a contract to provide electrical engineering services for Port Au Choix Wharf

Consulting Engineering | PORT AU CHOIX WHARF – NL

Old Perlican Wharf

Project: MER019 Old Perlican Wharf

Year: 2014

Client: Meridian Engineering

Description:

Maderra was contracted to provide electrical engineering design services for New Finger Pier Wharf Construction - Old Perlican. This project is being completed for the Department of Fisheries and Oceans.

Consulting Engineering | Old Perlican Wharf

Fort Amherst and Calvert Wharf

Project: DFO020 Fort Amherst and Calvert Wharf

Year: 2014

Client: Department of Fisheries and Oceans

Description:

Maderra has been awarded a contract by DFO to provide electrical engineering services for the remediation repair of Fort Amherst Wharf and Calvert Wharf.

Consulting Engineering | Fort Amherst and Calvert Wharf

Fender Panel Evaluation Study

Project: MAI001 Fender Panel Evaluation Study

Year: 2014

Client: Marine Atlantic

Description:

This job involves a fender panel evaluation study for Marine Atlantic Inc. (MAI), with an assessment of the current fender systems in conjunction with the applicable berthing energies and forces imposed by the four vessels (Atlantic Vision, Blue Puttees, Highlanders and the Leif Ericson). This job is being completed with AFN Engineering.

Consulting Engineering | Fender Panel Evaluation Study

Electrical Safety Presentation

Project: DFO015 Electrical Safety Presentation

Year: 2014

Client: DFO

Description:

Create a PowerPoint presentation for Wharf Electrical systems designed by Maderra to explain proper operations and safety guidelines. The presentation will be delivered by DFO staff, province-wide to various Harbour Authorities where equipment has been installed

Consulting Engineering | Electrical Safety Presentation

Electrical Systems at Wharf Infrastructure in Valleyfield, NL

Project: DFO014 Electrical Systems at Wharf Infrastructure in Valleyfield, NL

Year: 2014

Client: DFO

Description:

Maderra Engineering provided engineering services for the electrical systems wharf infrastructure in Valleyfield, NL. The recently constructed wharf required a new electrical service, complete with new pedestals and associated metering. DFO provided a new building to house the main service. In addition, an adjacent older wharf required metering for its existing pedestals.

Consulting Engineering | Electrical Systems at Wharf Infrastructure in Valleyfield, NL

DFO Wharf Electrical, Port De Grave

Project: MER017 DFO Wharf Electrical, Port De Grave

Year: 2013

Client: Meridian Engineering

Description:

Provide new electrical distribution.

Consulting Engineering | DFO Wharf Electrical, Port De Grave

Newtown Wharf Phase 2

Project: DFO013 Newtown Wharf Phase 2

Year: 2013

Client: Department of Fisheries and Oceans

Description:

Provide Electrical Design of New Electrical Shed/ pedestals for Wharf.

Consulting Engineering | Newtown Wharf Phase 2

Newtown Wharf Inspection Phase 1

Project: Newtown Wharf Inspection Phase 1

Year: 2013

Client: Department of Fisheries and Oceans

Description:

Perform Electrical Inspections of Newtown Marginal Wharf Electrical Shed.

Consulting Engineering | Newtown Wharf Inspection Phase 1

Wharf Electrical Modifications – Brent’s Cove

Project: DFO-012 Wharf Electrical Modifications – Brent’s Cove

Year: 2013

Client: Department of Fisheries and Oceans

Description:

Undertake Site Visit and Prepare Documents Associated With Electrical Modifications

Consulting Engineering | Wharf Electrical Modifications – Brent’s Cove

Wharf Electrical Modifications – WestPort

Project: DFO-011 Wharf Electrical Modifications – WestPort

Year: 2013

Client: Department of Fisheries and Oceans

Description:

Undertake Site Visit and Prepare Documents Associated With Electrical Modifications

Consulting Engineering | Wharf Electrical Modifications – WestPort

Wharf Electrical Modifications – Jackson’s Arm

Project: DFO-010 Wharf Electrical Modifications – Jackson’s Arm

Year: 2013

Client: Department of Fisheries and Oceans

Description:

Undertake Site Visit and Prepare Documents Associated With Electrical Modifications

Consulting Engineering | Wharf Electrical Modifications – Jackson’s Arm

Wharf Electrical Modifications - Summerford

Project: DFO-009 Wharf Electrical Modifications - Summerford

Year: 2013

Client: Department of Fisheries and Oceans

Description:

Undertake Site Visit and Prepare Documents Associated With Electrical Modifications

Consulting Engineering | Wharf Electrical Modifications – Summerford

Burin Marginal Wharf Electrical Service Relocation

Project: DFO-008 Burin Marginal Wharf Electrical Service Relocation

Year: 2013

Client: Department of Fisheries

Description:

Investigation of relocation of electrical service for Burin Marginal Wharf.

Consulting Engineering | Burin Marginal Wharf Electrical Service Relocation

Long Cove Wharf – Electrical Inspection and Upgrade Phase 1

Project: DFO-007 Long Cove Wharf – Electrical Inspection and Upgrade Phase 1

Year: 2013

Client: Department of Fisheries

Description:

Electrical Inspection and Upgrade of Long Cove Marginal Wharf #402, including the addition of new power pedestals and metering.

Consulting Engineering | Long Cove Wharf – Electrical Inspection and Upgrade Phase 1

Electrical Inspection

Project: DFO-006 Electrical Inspection

Year: 2013

Client: Department of Fisheries

Description:

Electrical Inspections of the Bonavista Marginal Wharf.

Consulting Engineering | Electrical Inspection

Electrical Inspection for St. Mary’s Wharf

Project: DFO-005 Electrical Inspection for St. Mary’s Wharf

Year: 2013

Client: Department of Fisheries and Oceans

Description:

Complete an inspection of electrical systems on the wharf in the Town of St. Mary’s which recently sustained damage

Consulting Engineering | Electrical Inspection for St. Mary’s Wharf

Arnold’s Cove Wharf Phase 2

Project: MER-015 Arnold’s Cove Wharf Phase 2

Year: 2013

Client: Meridian Engineering

Description:

Electrical design for Phase 2 Arnold’s Cove Government Wharf upgrade

Consulting Engineering | Arnold’s Cove Wharf Phase 2

Electrical Design for Milltown Wharf Upgrade

Project: MER-014 Electrical Design for Milltown Wharf Upgrade

Year: 2013

Client: Meridian Engineering

Description:

Electrical design for Milltown Government Wharf upgrade.

Consulting Engineering | Electrical Design for Milltown Wharf Upgrade

Arnold's Cove Wharf

Project: MER-002 / 003 Arnold's Cove Wharf

Year: 2012

Client: Meridian Engineering / Department of Fisheries and Oceans

Description:

Electrical Assessment as well as Engineering and Design of Arnold's Cove Wharf upgrades.

Consulting Engineering | Arnold’s Cove Wharf

English Harbour East Wharf

Project: DFO-004 English Harbour East Wharf

Year: 2012

Client: Department of Fisheries and Oceans

Description:

Electrical Assessment as well as Engineering and Design of English Harbour Wharf upgrades.

Consulting Engineering | English Harbour East Wharf

Fleur de Lys Government Wharf Upgrades

Project: AFN-001 Fleur de Lys Government Wharf Upgrades

Year: 2012

Client: AFN Engineering / Department of Fisheries and Oceans

Description:

Electrical Assessment as well as Engineering and Design of Fleur de Lys Wharf upgrades.

Consulting Engineering | Fleur de Lys Government Wharf Upgrades

Pools Cove Wharf

Project: MER-009 Pools Cove Wharf

Year: 2011

Client: Meridian Engineering / Department of Fisheries and Oceans

Description:

Electrical Assessment as well as Engineering and Design of Pools Cove Wharf upgrades.

Consulting Engineering | Pools Cove Wharf

Bonavista Wharf

Project: MER-004 Bonavista Wharf

Year: 2011

Client: Meridian Engineering / Department of Fisheries and Oceans

Description:

Electrical Assessment as well as Engineering and Design of Bonavista Wharf Upgrades

Consulting Engineering | Bonavista Wharf

Burin Wharf

Project: DFO-003 Burin Wharf

Year: 2011

Client: Department of Fisheries and Oceans

Description:

Electrical Assessment of Burin Wharf upgrades.

Consulting Engineering | Burin Wharf

Nippers Harbour Wharf

Project: DFO-001 Nippers Harbour Wharf

Year: 2011

Client: Department of Fisheries and Oceans

Description:

Electrical Assessment as well as Engineering and Design of Nippers Harbour Wharf upgrades.

Consulting Engineering | Nippers Harbour Wharf

Medical Facilities

Orthodontist Building M&E Design

Project: SCA- 001 Orthodontist Building M&E Design

Year: 2012

Client: Sheppard Case Architects Inc.

Description:

Overall Mechanical and Electrical Engineering and Design for a new 20,000sqft Orthodontist/Retail Building for Power's Field Centre business park.

Consulting Engineering | Orthodontist Building M&E Design

New Modular Medical Clinic

Project: TAL-007 New Modular Medical Clinic

Year: 2012

Client: Talon Energy Services / Fluor

Description:

Engineering, Design and Project Management of Mechanical, Electrical, and Structural systems for new Medical Clinic for Long Harbour Processing facility. Work completed in partnership with Gibbons Snow Architects.

Consulting Engineering | New Modular Medical Clinic

Medical Clinic Renovations

Project: RAV-004 Medical Clinic Renovations

Year: 2012

Client: Ravencor Projects / Kiewit Kvaerner Contractors

Description:

Engineering and Design of Mechanical and Electrical renovations for the Bull Arm Site Medical Clinic.

Consulting Engineering | Medical Clinic Renovations

Long Term Care Facility Parking Lot Lighting System

Project: HAR-002 Long Term Care Facility Parking Lot Lighting System

Year: 2011

Client: Harris and Associates

Description:

Electrical Engineering and Design of Lighting System for Carbonear Long Term Care Facility.

Consulting Engineering | Long Term Care Facility Parking Lot Lighting System

G.B. Cross Memorial Hospital Operating Room Renovations

Project: FSA-005 G.B. Cross Memorial Hospital Operating Room Renovations

Year: 2011

Client: Frank Stanley and Associates / Government of NL Eastern Health

Description:

Engineering and Design of Mechanical and Electrical renovations of the G.B. Cross Memorial Hospital Operating Room.

Consulting Engineering | G.B. Cross Memorial Hospital Operating Room Renovations

G.B. Cross Memorial Hospital Mammography Unit Renovations

Project: FSA-002 G.B. Cross Memorial Hospital Mammography Unit Renovations

Year: 2011

Client: Frank Stanley and Associates / Government of NL Eastern Health

Description:

Engineering and Design of Mechanical and Electrical renovations of the G.B. Cross Memorial Hospital Mammography Unit.

Consulting Engineering | G.B. Cross Memorial Hospital Mammography Unit Renovations

Municipal Infrastructure

Happy Valley Goose Bay Ballfield Dugout Slab Shoring

Project: RAV013 Happy Valley Goose Bay Ballfield Dugout Slab Shoring

Year: 2015

Client: Ravencor

Description:

​Maderra was contracted to provide structural engineering support for the Ballfield Dugout Slab Shoring Support in Happy Valley Goose Bay, Labrador. Specifically, Maderra provided dugout slab on grade shoring calculations and dugout slab on grade shoring drawings.

Consulting Engineering | Happy Valley Goose Bay Ballfield Dugout Slab Shoring

LIGHTING UPGRADES TO THE TOWN CENTRE - CHURCHILL FALLS

Project: RDB009 LIGHTING UPGRADES TO THE TOWN CENTRE - CHURCHILL FALLS

Year: 2015

Client: RDB Engineering

Description:

Maderra has been contracted to provide electrical engineering services for lighting upgrades to the Town Centre - Churchill Falls

Consulting Engineering | LIGHTING UPGRADES TO THE TOWN CENTRE – CHURCHILL FALLS

Stephenville Public Building

Project: EXP005 Stephenville Public Building

Year: 2013

Client: Exploits Engineering

Description:

Provide M&E Design for renovations for Stephenville Public Building.

Consulting Engineering | Stephenville Public Building

Badger Chlorination Building Generator

Project: EXP004 Badger Chlorination Building Generator

Year: 2013

Client: Exploits Engineering

Description:

Provide Electrical Design for chlorination building to allow for backup generator.

Consulting Engineering | Badger Chlorination Building Generator

Town of Badger Water Systems – Emergency System Modifications

Project: EXP-001 Phase 2 Town of Badger Water Systems – Emergency System Modifications

Year: 2013

Client: Exploits Engineering

Description:

Complete the electrical design of the water tank control building and detail the requirements for commissioning a wireless link and PLC programming in the main pump house.

Consulting Engineering | Town of Badger Water Systems – Emergency System Modifications

Flatrock Community Centre

Project: GIB-004 Flatrock Community Centre

Year: 2013

Client: Gibbons & Snow Architects

Description:

The project included the renovation of the main level of an existing community centre for the Town of Flatrock (approx. 550 m2). The community centre is used to hold wedding receptions, concerts and other community events. The new space layout included a large reception area, stage, washrooms, small boardroom, and residential grade kitchen facilities.

Project Role
Maderra Engineering completed the building assessment of the existing mechanical and electrical equipment, as well as the new design to suit the space layout changes and upgrades.

Challenges
Due to the age and condition of the building, several mechanical and electrical systems required upgrading to meet new building code requirements. The building was also initially built and operated as a school, therefore the functionality of the space wasn’t necessarily suited for a community centre operation. This project was also on a tight construction schedule to meet commitments and rentals undertaken by the client. Several issues were not evident until the demolition stage, therefore this project was very reactive and issues had to be resolved in a timely manner as to not negatively impact schedule.

Consulting Engineering | Flatrock Community Centre

Random Sound West Fire Hall

Project: MER-016 Random Sound West Fire Hall

Year: 2013

Client: Meridian Engineering

Description:

Electrical and Mechanical renovations of existing fire hall, including new heat, lights, gas detection and exhaust fans for building extension.

Consulting Engineering | Random Sound West Fire Hall

Kings Cove Fire Hall

Project: MER-013 Kings Cove Fire Hall

Year: 2012

Client: Meridian Engineering / Government of NL Municipal Affairs

Description:

Mechanical and Electrical Engineering and Design of New Fire Hall for King's Cove.

Consulting Engineering | Kings Cove Fire Hall

Town of Badger Water Treatment Facility

Project: MER-010 Town of Badger Water Treatment Facility

Year: 2011

Client: Meridian Engineering / Town of Badger

Description:

Mechanical and Electrical Engineering and Design of new chlorination pumping station for Water Treatment Facility for Town of Branch.

Consulting Engineering | Town of Badger Water Treatment Facility

Water Treatment Facility

Project: DMA-001 Water Treatment Facility

Year: 2011

Client: Government of NL Municipal Affairs / Town of Branch

Description:

Mechanical and Electrical Engineering and Design of New Water Treatment Facility for Town of Branch.

Consulting Engineering | Water Treatment Facility